Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Mounting The Feet; Checking The Items Supplied; Packaging - STEELFORCE PRO SLS Highline 135-Serie Montageanleitung

Vorschau ausblenden Andere Handbücher für PRO SLS Highline 135-Serie:
Inhaltsverzeichnis

Werbung

3 Assembly

Before attempting assembly, read the safety information in Section 2.

3.1 Checking the items supplied

• Carefully open the cardboard packaging.
• In doing so, do not use any long knife blades. They may damage the components inside.
• Check the parts supplied against the list in Section 1.6 Content box.
• Do not attempt to assemble the workstation frame if there is any damage or if there are any incor-
rect components.

3.2 Packaging

• Remove the packaging. Treat as household waste/paper.
• Observe national legislation.

3.3 Tightening torques for screws used

• Assemble the workstation frame with the tools supplied only.
3.4 Pre-assembly of the Crossbars for Frame set-up for 114 cm and 124 cm for Main Return
and 118 cm and 128 cm for Side Return
Recommended Top Sizes
Width / size table top (Main
Return & Side Return)
133 cm
143 cm
1
Adjust the frame into the desired width. Tighten the set screws on the crossbar with Allen
key M5.
Maximum Screw Torque : 10N-m
Frame set-up
Frame set-up
(Main Return)
(Side Return)
114 cm
118 cm
124 cm
128 cm
7
J
5
6
Depth / size
Table Top Thickness
table top
80 cm
2.5 cm
80 cm
2.5 cm
7
English
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis