Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Procedure - LEGRAND Keor MOD 3 111 19 Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28

2. Installation procedure

2.1
Step 1
Remove the UPS cabinet from the pallet by following the unpackaging instructions in the installation manual.
Do not proceed with step 2 until the unpackaging has been completed.
2.2
Step 2
Install the lateral mounts (A) to the ground keeping them aligned and with each other.
Use 6 (3+3) M16 certified seismic fasteners to install the subassemblies, following the indications provided by the supplier.
Install the lateral mounts in the final placement of the unit.
Torquing moment for M16 provided by seismic anchor producer.
a3
A
Keor MOD
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Keor mod 3 111 20

Inhaltsverzeichnis