Herunterladen Diese Seite drucken

Assembly Procedures - GGM Abbey.HS27.221.E Montageanleitung

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

ASSEMBLY PROCEDURES

STEP 1
1-1. Line up holes on the bracket of wheel assembly with the
corresponding holes on base, then insert M8 x 16 mm bolts
through holes. Tighten with M8 flange nuts. Be sure the wheel
assembly is parallel to the base.
1-2. Put the 3 pcs pole brackets on each position on the base as
shown in the picture.
1-3. Use 3 Medium Bolts (M8x16) to join the pole brackets and stand.
STEP 2
2-1. Put the pole on the top of 3 pcs pole brackets.
2-2. Use 6 Large Bolts and Flange Nuts (M6) to connect the pole to the
3 pcs pole brackets. Tighten the bolts and nuts.
STEP 3
Place the tank housing on the stand.
- 3 -
STEP 1
Pole bracket
Bolt
Stand
Nut
Bolt
Wheel Kit
STEP 2
Pole
Bolt
Nut
STEP 3
Tank housing

Werbung

loading

Diese Anleitung auch für:

Abbey.hs27.221.s