Herunterladen Diese Seite drucken

GF Piping Systems JRGURED LF Montageanleitung Seite 16

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
E
Commissioning
Prior to commissioning the pressure-
reducing valve, the inlet line has to be
thoroughly flushed out.
For the commissioning please refer
to the separate operating and mainte-
nance instructions.
Resetting the pressure-reducing valve
Any change to the factory pressure
setting is carried out exclusively on the
responsibility of the person doing so.
For resetting the pressure, please
refer to the separate operating and
maintenance instructions.
16
Maintenance
For the maintenance of the coarse
filter, please refer to the separate
operating and maintenance instruc-
tions. These have to be given to the
building owner when the installation
is handed over.
Repairs to the pressure-reducing valve
JRGURED LF must not be attempted.

Werbung

loading

Diese Anleitung auch für:

Jrg code 1319 56 psiJrg code 1339 80 psi