Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Tools needed for Installation (not included)
4

Installation scheme

5
IMPORTANT:
The injection of pH-Minus Liquid Domestic or pH-Plus Liquid and Chloriliquide must be the last component of the
installation before flowing into the pool. Make sure that the pressure in the circulation line does not exceed 1.0 bar!
We recommend using the convenient BAYROL Smart&Easy Connector with the additional flow monitoring.
Electrical installation scheme
6
IMPORTANT:
The electrical installation of the Automatic
must be done by an electrician.
1. Residual Current Protective Device (RCD)
≤ 30 mA
2. Filter control respectively time switch
3. Power supply for dosing pumps (voltage only
when circulation pump is running)
Cutting the hoses
7
24
Cl-pH
90°

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis