Herunterladen Inhalt Inhalt Diese Seite drucken

Zipper Maschinen ZI-GAB165AN Betriebsanleitung Seite 9

Inhaltsverzeichnis

Werbung

ZIPPER MASCHINEN GmbH
www.Zipper-Maschinen.at
Pressen Sie das untere Ende der
Gasdruckfeder (S7) auf den Kugelkopf
(G3) (siehe Abbildung links).
Assembly (EN)
1.
Assembly corner brackets
Assemble the two corner brackets (C1,
C2) to the left side panel (P1) using
screws and nuts (F2) and washers
(S3).
Note: Make sure that the cut-out for
the large bore hole at the front, left
corner bracket (C2) is at the top edge.
Leave out the top and bottom screw
connection for the time being. This is
where the edge protectors and the
bottom plate will be fixed later (see
illustration on the left).
2. Assembly holder for gas spring
Assemble the holder for the gas spring
(C5) on the upper transverse brace of
the left side panel using screws /nuts
(F2) and washers (S3) and on the
upper edge of the side panel using
short screws (F1).
Mount the ball head (S7) to the holder
for the gas spring (C5) using short
screws (F11) (see illustration on the
left).
MONTAGE / ASSEMBLY
ZI-GAB165AN/ZI-GAB165GR
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Zi-gab165gr91200392343049120039234274

Inhaltsverzeichnis