Herunterladen Inhalt Inhalt Diese Seite drucken

Zipper Maschinen ZI-GAB165AN Betriebsanleitung Seite 11

Inhaltsverzeichnis

Werbung

ZIPPER MASCHINEN GmbH
www.Zipper-Maschinen.at
MONTAGE / ASSEMBLY
6. Assembly corner brackets
Assemble the two corner brackets (C1,
C3) to the right side panel (P2) using
screws / nuts (F2) and washers (S3).
Note: Make sure that the cut-out for
large bore holes at the front, right
corner bracket is at the top edge.
Leave out the top and bottom screw
connection for the time being. This is
where the edge protectors or bottom
plate will be fixed later (see illustration
on the left).
7. Assembly holder for gas spring
Assemble the holder for the gas spring
(C5) on the upper transverse brace of
the right side panel using screws / nuts
(F2), washers (S3) and on the upper
edge of the side panel using short
screws (F1).
Mount the ball head (S7) to the holder
for the gas spring (C5) using short
screws (F1) (see illustration on the
left).
8. Assembly right side panel
Assemble the right side panel (P2) to
the front and back panel using
screws/nuts (F2), washers (S3) (see
illustration on the left).
11
ZI-GAB165AN/ZI-GAB165GR

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Zi-gab165gr91200392343049120039234274

Inhaltsverzeichnis