Herunterladen Inhalt Inhalt Diese Seite drucken

Occhio Sento sospeso due Montageanleitung Seite 109

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Elongated
holes for the
power outlet
Drilled holes
Place the ceiling profile over the
power outlet and against the cei-
ling, and turn it until the elongated
holes are aligned as required.
Mark the positions where the holes
are to be drilled.
Drill two 8 mm diameter holes,
push in the rawlplugs so that they
lie flush and screw in the ceiling
profile ( screws and rawlplugs are
included in the scope of delivery ) .
Ensure that the screws finish flush
with the ceiling profile.
Check the routing of
the power cables.
Caution!
Before fitting, disconnect all
current-carrying lines from the
mains supply.
107

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sento sospeso tre

Inhaltsverzeichnis