Herunterladen Diese Seite drucken

Leviat HALFEN HUC Montageanleitung Seite 4

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 6
HALFEN HUC
Assembling example
6. HALFEN HSC-B Connection must
be installed in accordance with the
engineer's specifi cation. It is
recommended to attach it with
magnets to steel formwork or by
nailing to wooden formwork.
Observe the diff erent
!
edge distances of the
bolt holes in the
positioning plate and
the face plate
Positioning plate
Face plate
d
1
d
2
4
Alternative:
Fixing to formwork by screwing
(formwork penetration);
the positioning plate must be fl ush
with the formwork
© 2021 HALFEN · INST_HUC 06/21 · www.halfen.com
Assembly Instructions
7. The column and additional
reinforcement are installed
according to the design drawings
provided by the structural
engineer.
8. To secure the position of the
HSC-B Connection bars they must
be wire-tied to the longitudinal
column reinforcement.

Werbung

loading