FINAL CHECK LIST

1.
Is the unit in a room where ambient
temperatures are within a minimum of 10
(50°F) even in winter months?
2.
Is there at least a 15 cm (6") clearance
around the unit for proper air circulation?
3.
Is the unit level? (IMPORTANT)
4.
Have all the electrical and plumbing
connections been made, and is the water supply
shut-off valve open?
5.
Has the voltage been tested and checked
against the data plate rating?
6.
Has the water supply pressure been
checked to ensure a water pressure of at least
WARNING. This icemaker is not designed for outdoor installation and will not function in
ambient temperatures below 10°C (50°F) or above 40°C (100°F).
This icemaker will malfunction with water temperatures below 5 °C (40°F) or above 35 °C
(90°F).
1 bar (14 psi).
7.
to guard against vibrations and possible failure.
°C
8.
clean?
9.
Manual and been instructed on the importance of
periodic maintenance checks?
10. Has the Manufacturer's registration card
been filled in properly? Check for correct model
and serial number against the serial plate and
mail the registration card to the factory.
11. Has the owner been given the name and
the phone number of the authorized Service
Agency serving him?
G.

INSTALLATION PRACTICE

7
Check all refrigerant lines and conduit lines
Have the bin liner and cabinet been wiped
Has the owner/user been given the User
1. Hand shut-off valve
2. Water filter
3. Water supply line (flexible hose)
4. 3/4" male fitting
5. Vented drain
6. Open trapped vented drain
7. Drain fitting
8. Main switch
9. Power line