EN-6
3. Basic requirements and installation
3.1.
Basic requirements
Ensure that the installation is performed according to the instructions, and the
surface is flat in the area where the scale will be positioned,
The Height difference of the surface must not exceed 1mm. The maximum
weight capacity of the surface at the four cell feet position should be higher
than the maximum allowed weight of the cell.
3.2. Standard installation
1.
Take out the weighing platform and place it on the ground.
2.
Take out the footplates and place them at four corners of the platform.
3.
Adjust the height of the load cell to ensure that feet are stable on the
footplates.
4.
Secure the ramp and mounting plate with M10 hex bolts and protective
sleeves. (Check below picture for detail)
5.
Secure four footplates with expansion bolts.
6.
Connect the signal cable with the indicator.
LEGEND: a. M10 hex bolts, b. Protective sleeves
Figure 3-1 Standard Installation
Defender Series Floor Scale