Herunterladen Diese Seite drucken

S.C.A.T. Europe SymLine 90 Serie Montage- Und Einbauanleitung Seite 20

Entsorgungssysteme

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DRILL HOLE FOR
DESKTOP MOUNT
6a.
Determine the position of the
safety funnel on the workplace
EN
surface. Pay attention to the
funnel diameter and the overall
dimensions, when the funnel lid
is completely open. Maintain a
certain distance to any nearby
rear or side walls. Mark the
drilling position for the desktop
mount. The drilled hole must
have a diameter of Ø 35 mm.
6b.
Drill for the desktop mount
with a 35 mm drill bit.
6c.
Ø 35 mm drilled hole in
the workplace surface.
DESKTOP MOUNT/
ANTI-ROTATION PROTECTION
7a.
The desktop mount is equipped
with an anti-rotation protection.
The drilled hole on the work
surface requires recesses at the
appropriate places. Determine
the distance with a calliper or a
comparable measuring tool.
7b.
Align the calliper
to the drilled hole.
7c.
Mark the left recess
at the drilled hole.
7d.
Mark the right recess
at the drilled hole.
7e.
Intensify the markings.
7f.
Places for recesses well-marked.
www.symline.de
Type 90 underbench waste cabinets
6a.
Ø 35 mm
6c.
7a.
7c.
7e.
20
Waste System with tubing and
6b.
7b.
7d.
7f.
Sym Line ® is a Brand of

Werbung

loading