Herunterladen Inhalt Inhalt Diese Seite drucken

Quax MAGALIE Serie Handbuch Seite 32

Drehtürschrank mit 1 schublade
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

LOUISE
MAGALIE
Quax
Quax
First dreams
First steps
®
®
Step 12 : Use the back of the drawer (12), the sides of the drawer (13 and 14), 8 dowels (C), 8 eccentric
cams (A) and 8 coonector bolts (B)
Push 8 dowels (C) in the provided openings (drawing 12) of the backside and the sides of the drawer. Insert
8 eccentric cams (A) in the provided openings of the drawersides. Insert 8 connecting bolts (B) in the pro-
vided openings fi tted with the eccentric cams.
Step 13 : Use the parts of step 12, the bottom of the drawer (12) and the drawer front (11) and the
slideprofi les (J) and the wood screws (G).
Push the bottom (12) into the grooves of the drawer sides. Place the front of the the drawer allover the
extruding connecting bolts and tighten the eccentric cams. Put the slideprofi les (J) on the underside of the
drawer and fi x these with the wood screws (G).
Step 14 : Use the assembled wardrobe, the wardrobe rail (17), the shelf (16) and the assembled drawer
Insert the wardrobe rail into the rail supports. Put the shelf on its supports. Push the wheels on the drawer
slides into the slideprofi les on the wardrobe, push the drawer to the back of the wardrobe and simultane-
ously lower it.
32
Draaideurkast met 1 lade
Kinderbed met verstelbare bodem
01 01 43XX
54 04 51xx
Drehtürschrank mit 1 Schublade
KInderbett mit verstelbarer Boden
Armoire à portes battentes avec 1 tiroir
Lit enfant avec fond réglable
Babybed with adjustable bottom
Wardrobe with 1 drawer

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis