Herunterladen Diese Seite drucken

RiverRidge 06-163 Montageanleitungen Seite 11

Werbung

STEP 4
1.
Insert 5 wood dowels (A) into wood dowel holes on upper left side board (2).
2.
Attach 2 fixed shelves (11) and upper cross bar (5) to upper left side board (2) by inserting
cam bolts into cam lock holes and inserting wood dowels into wood dowel holes on fixed
shelves (11) and upper cross bar (5).
3.
Insert 4 cam locks (D) into cam lock holes on fixed shelves (11), then rotate clockwise to
secure cam bolts (B) in place.
STEP 5
1.
Insert 5 wood dowels (A) into wood dowel holes on fixed shelves (11) and upper cross
bar (5).
2.
Attach upper right side board (3) to fixed shelves (11) and upper cross bar (5) by inserting
cam bolts into cam lock holes on fixed shelves (11) and inserting wood dowels into wood
dowel holes on upper right side board (3).
3.
Insert 4 cam locks (D) into fixed shelves (11), then rotate clockwise to secure cam bolts (B)
in place.
5
11
A
A
A
5
2
D
D
A
11
D
A
D
A
2
3
A
D
A
A
11
A
11
D
D
D

Werbung

loading