The following schedule details the attentions considered necessary to ensure satisfactory operation of the power unit.
NOTE:- The attentions and periods summarised in the schedule are the initial recommendations and should be revised to suit the
Power Unit working conditions.
Item
Complete Unit
Transmission Hoses
Engine
Hydraulic Tank
Oil Cooler.
Hydraulic pipes
System Pressure and Flow Checks
relief valve setting is correct. The hydraulic oil will tend to get quite hot during this operation and therefore the checking should be
carried out as quickly as possible and the load valve opened before excessive temperatures are reached.
DO NOT EXCEED 3600 RPM (2900 RPM for Major 30-140)"on load" .
speed then the pump must be replaced
Downloaded from
www.Manualslib.com
Service & Maintenance
Attention
Keep all areas clean and free from dust, debris etc.
Check security of all fasteners especially on engine mountings.
Examine for leaks or damage.
Check for the correct positioning of the protective sleeves.
Check oil level.
Examine mountings.
Examine exhaust silencer for damage of deterioration.
Check for excess vibration when running.
Check oil level.
Change Hydraulic Oil.
Externally clean using compressed air.
DO NOT USE A WIRE BRUSH.
Examine for oil leaks.
manuals search engine
First 50
Hours
20
10
100
300
Hrs
Hrs
Hrs