Herunterladen Diese Seite drucken

Kaiser HWD 90 Montageanleitung Seite 3

Electronic-dose
Vorschau ausblenden Andere Handbücher für HWD 90:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Boarding materials
Wall types
Drywall
EI30, EI60 and EI90
Drywall
EI120
EI30
-
EI120
Wood panel,
wood frame
construction wall
EI30
Wood panel,
wood frame
construction wall
EI60
EI30
-
EI60
Labelling
1
Wood or steel framework
Double panelling on both sides with 12.5 mm thick non-
2
combustible mineral gypsum- or cement-bound
Internal insulation of at least 40 mm thick
mineral wool (glass or rock wool) with a gross density of
3
at least 14 kg/m³, melting point > 1.000°C is not
1
Double boarding on both sides with 15 mm thick
2
plasterboard fire protection panels (GKF)
Internal insulation of at least 40 mm thick
3
non-combustible mineral wool with a melting point >
1
Wooden framework 40x60 mm
Double panelling on both sides with ≥15 mm thick OSB-,
2
plywood or MDF boards (bulk density ≥ 550 kg/m³)
Double layer panelling on both sides with ≥ 9.5 mm thick
3
non-combustible cement- or gypsum-bond building board
Internal insulation of at least 40 mm thick
mineral wool (glass or rock wool) with a bulk density
of at least 14 kg/m³, melting point > 1.000°C is
4
not absolutely necessary, or normally flammable
wood wool or wood fibre insulation with a bulk density
1
Wood framework 80 mm
Double panelling on both sides with ≥15 mm thick OSB-,
2
plywood or MDF boards (bulk density ≥ 550 kg/m³)
Double layer panelling on both sides with ≥ 12.5 mm thick
non-combustible 87 / 5000
3
Übersetzungsergebnisse mineral gypsum or cement-bonded
building boards or calcium silicate boards (GRP)
Internal insulation of at least 60 mm thick
mineral wool (glass or rock wool) with a bulk density
of at least 14 kg/m³, melting point > 1.000°C is
4
not absolutely necessary, or normally flammable
wood wool or wood fibre insulation with a bulk density
Description
building panels
mandatory
Steel framework
1,000°C
(GKB)
≥ 50 kg/m³
≥ 50 kg/m³

Werbung

loading