Herunterladen Diese Seite drucken

eibe 559112 Montageanleitung Seite 4

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Attention:
Please keep these documents!
Please indicate the RM-code on all inquiries and complaints.
Installation notes:
Knock round-head screws only with a rubber hammer to avoid damaging the anticorrosive coating. Use washers
underneath all nuts and tighten them carefully. If overtightened , an unnecessary number of wood fibres under the screw
head will tear. Counterbores are provided for countersinking the screw nuts. For easier positioning in the counterbores,
insert one or two screw nuts into the nut and place on the screw. Use a high-performance two-speed power drill for the
assembly of the play equipment.
Site requirements:
Please refer to the information in our tender documents and in the foundation plan. Before putting the equipment into
service, ensure that all assembly tools have been removed. Unusual site conditions such as peat soil or frozen
underground must be taken into account for the dimensioning of the foundation.
The assembly instructions in the maintenance manual must be observed.
Further information can also be found in the enclosed maintenance instructions!
Further particular information and installation details, which are eventually to be considered for the yearly inspection, are
specified in this documentation.
Fußnoten:
Impact surface in accordance with EN1176
a) Yellow (inner) area shows the impact surface with shock absorption requirements.
Surfacing inside the impact area (DE/AT/NL):
Sand
Surfacing inside the impact area (other countries):
Sand
b) The outer line encloses the entire impact surface.
Generally, a space of 1.5 m around each piece of playground equipment must be kept free of hard and sharp-
edged as well as protruding parts.
Key foundation list
ID
Type
X
Y
Z
α
FS
DS
SP
Slides are not included.
Safe use of the equipment only with original eibe slide or by closing the slide opening in accordance with DIN EN
1176.
For detailed information, e.g. impact area or foundations, please see the enclosed slide installation instruction.
eibe Produktion + Vertrieb GmbH & Co. KG | Industriestraße 1 | 97285 Röttingen | www.eibe.de
Gravel
Wood chips
Gravel
Wood chips
= foundation number
=
OF=concrete foundation
=
FFk=eibe-prefab foundation
=
FFr=eibe-prefab foundation
=
FFg=eibe-prefab foundation
=
FL3=Prepare AFTER the installation!
= horizontal measure to 0-point
= vertical measure to 0-point
= op edge of foundation to surface soil
= orientation of foundation
= Size foundation: length x width x height (L x W x H)
= Size drainage layer: length x width x height (L x W x H)
= Slide attachment point (Slide Point)
Impact-
turf
attenuating tiles
Impact-
turf
attenuating tiles
C20/25,
small,
round,
large,
Top soil
concrete
Top soil
concrete
stone
stone
4/16

Werbung

loading

Verwandte Produkte für eibe 559112