Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Transport And Storage; Unpacking; Installation Requirements - Grundfos Conex DIA-1-A PA/HP Montage- Und Betriebsanleitung

Unit for measurement and control
Vorschau ausblenden Andere Handbücher für Conex DIA-1-A PA/HP:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 19

9. Installation

9.1 Transport and storage

Transport the device carefully, do not drop.
Store at dry and cool location.

9.2 Unpacking

Caution
Do not allow any foreign bodies to enter!
Check the device for damage.
Do not install or connect damaged devices!
Install as soon as possible after unpacking.
Retain the packing material or dispose of it according
Note
to local regulations.

9.3 Installation requirements

Dry room
Room temperature: 0 °C to 50 °C
Vibration-free location.
Observe the data in section
8. Technical
If you do not observe the installation requirements,
Caution
the device may be damaged!
The measurements may not be correct!
Only mount the device on a completely level surface!
Caution
Ensure that the base plate is not twisted!

9.4 Assembling

®
9.4.1 Assembling the Conex
1. Drill four dowel holes with a diameter of 10 mm.
See section
8.3 Dimensional sketches / drilling
2. Insert the supplied dowel pins.
3. Screw the device onto the wall.
®
9.4.2 Assembling the Conex
for installation in control panel
1. Make an opening of 92 + 0.8 mm x 92 + 0.8 mm in the control
panel.
2. Slip on the supplied gasket.
®
3. Insert the Conex
DIA-1 / Conex
from the front.
Do not damage the gasket.
Caution
The gasket must be fitted exactly.
4. Hook the clamps into the tightening cones on the sides at the
top and bottom.
5. Secure the device from the rear using a screwdriver.
10
data.
®
DIA-1 / Conex
DIA-2Q
diagram.
®
DIA-1 / Conex
DIA-2Q housing
®
DIA-2Q into the opening

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Conex dia-2q-a pa/hp

Inhaltsverzeichnis