Herunterladen Inhalt Inhalt Diese Seite drucken

Mareva Premium pH Handbuch Seite 18

Mess- und regelanlage
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.4 Dosing pump installation to the electrode holder
(For wall installation use the wall bracket and screws with dowel).
3.5 Connection of the Dosing pump plug to the socket 230 Vac
Warning!
At this stage, if the setting up of the installation is not correct, or if the potentiometer position have
been modified, proceed as per point (6.0), and points from (9.0) to (9.3)
3.6 Electrode protection removal
-
Remove the cap
3.7 Electrode installation procedure
-
Introduce the two sealing O.rings on the electrode
-
Introduce the fixing ring nut on the electrode cable
-
Introduce the electrode into the holder
-
Fix the ring nut by hand (do not use tools).
-
17

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Mareva Premium pH

Inhaltsverzeichnis