Herunterladen Inhalt Inhalt Diese Seite drucken

Pre-Installation Requirements; Routine And Special Maintenance - glass 1989 NOOR STEAM NN Installations- & Wartungsanleitung

Inhaltsverzeichnis

Werbung

Do not remove the sticker from the product!
Figure A
WARNING.
Read the manual carefully in all its parts before using the
product.
All measurements are in mm.

PRE-INSTALLATION REQUIREMENTS

GROUNDWIRE.
EQUIPOTENTIAL CONNECTION.
The
following
accessories
manufacturer) are re uired for installation:
kit and no other types of piping must be used.
ROUTINE AND
SPECIAL MAINTENANCE
After cleaning, rinse thoroughly with plenty of water to
remove all traces of detergent and dry with a soft cloth.
A
:
VOID
IMPORTANT:
13
EN
C.P.
(not
supplied
by
the
pipes provided in the

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Noor steam nc

Inhaltsverzeichnis