Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance - Contracor PBT-2 Bedienungsanleitung

Rohrinnenstrahlgerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4. Maintenance

Routine maintenance must be performed to achieve maximum blasting performance of this
Tool.
2–3 drops of 10mg weight lubricating oil should be added to the air inlet port on the
pneumatic motor before and after each daily use.
Remove the blast head at the end of each shift (8–10 hours) and clean the packing gland
and blast tube of all oil, dust and abrasive. Apply a thin layer of grease to the end of the
blast tube and slide the packing gland to the proper position.
Grease is filled into the PBT-2 air motor via the grease fitting on the air motor body. Apply
grease until excess grease appears from the internal seal gland o-rings or seal.
Install the blast head on the PBT-2 Tool and tighten the lock nut to secure the head.
The blast head should be hand tight. Do not over tighten the blast head.
CONTRACOR
PBT-2 Art. 12 700
9
®
Downloaded from
www.Manualslib.com
manuals search engine

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis