Herunterladen Inhalt Inhalt Diese Seite drucken

Connection; Scope Of Delivery; Installation - Diehl AKO PLATINUM S serie Installations- Und Bedienungsanleitung

Phasebalancer
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
5

Connection

5.1

Scope of delivery

Î
Connection cable
Î
Installation and operating manual
5.2

Installation

It is possible to monitor and control groups of three PLATINUM
inverters each.
Prerequisites:
Î
One PLATINUM inverter of each group respectively is connected
to one of the three phases (see Fig. 1).
Î
In case of more than three inverters with PhaseBalancer function:
t
PLATINUM inverters form groups of three inverters each
(see Fig. 2)
1
=
~
L
1
L
2
L
3
N
Fig. 1
Installation diagram
(1) EIA 232, plug connector 2 or 3
(2) EIA 232, plug connector 1
(3) EIA 232, plug connector 2 or 3
Installation and operating manual: PLATINUM PhaseBalancer
Version 05/2010
Mat. No. 742 679-AA
2
=
=
~
PLATINUM PhaseBalancer
3
~
Connection
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ako platinum tl serie

Inhaltsverzeichnis