Herunterladen Inhalt Inhalt Diese Seite drucken

R&S NGE100 Erste Schritte Seite 64

Inhaltsverzeichnis

Werbung

®
R&S
NGE100
4. Check the caps of both fuses that you want to change to for their ratings.
There should be written either T5A250V for 115 V or T2.5A250V for 230 V.
The fuse size is 5 x 20 mm.
5. Once verified, insert the fuses into each groove of the fuse holder.
6. Return the fuse holder to its position in the panel.
To switch on the instrument:
1. Connect the power cable to the AC inlet and switch on the mains power.
2. Press Power key on the front panel.
The instrument performs a system check, boots the operating system, and
starts the R&S NGE100 firmware.
By default, all output channels are off when the instrument is switched on to
prevent connected loads from being damaged unintentionally.
To switch off the instrument, press Power key again.
Getting Started 5601.1308.02 ─ 04
Instrument Tour
Switching On the Instrument
19

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis