Herunterladen Inhalt Inhalt Diese Seite drucken

Setting Up The Instrument; Bench Operation - R&S NGE100 Erste Schritte

Inhaltsverzeichnis

Werbung

®
R&S
NGE100
Risk of damage during transportation and shipment
Insufficient protection against mechanical and electrostatic effects during
transportation and shipment can damage the instrument.
● Always ensure that sufficient mechanical and electrostatic protection are
provided
● When shipping an instrument, the original packaging should be used. If
you do not have the original packaging, use sufficient padding to pre-
vent the instrument from moving around inside the box. Pack the instru-
ment in antistatic wrap to protect it from electrostatic charging
● Secure the instrument to prevent any movement and other mechanical
effects during transportation
Delivery package
The package contents contain the following items:
● R&S NGE100 power supply preloaded with two 230 V fuses
● Four power cables
● Two 115 V fuses (replace the preloaded fuses with these fuses depending on
the mains voltage, see
on page 18 for more information)
● One Getting Started manual
● One document folder containing safety instructions and calibration certificate
3.4

Setting Up the Instrument

The R&S NGE100 is designed for benchtop and rackmount.
3.4.1

Bench Operation

On a benchtop, the R&S NGE100 can either lie flat or stand on its feet. As shown
in
Figure
3-1, feet on the bottom can be folded out to set the instrument in an
inclined position.
Getting Started 5601.1308.02 ─ 04
Chapter 4.2, "Switching On the
Putting into Operation
Setting Up the Instrument
Instrument",
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis