Herunterladen Diese Seite drucken

Installation; Operation - Ingersoll-Rand IR17JV Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für IR17JV:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 30
LUBRICATION
Always use an air line lubricator with these tools. We
recommend the following Lubricator–
Unit and Lubricant:
In Line Lubricator: CPN: 35371111
Lubricant:
Light rockdrill oil, 1 US Gal (3.7 litres) CPN: 51378701
Medium rockdrill oil, 1 US Gal (3.7 litres) CPN: 51378693
Attach the lubricator as close to the tool as prac tical.
After each two or three hours of operation and at the be-
ginning of each work shift, if an air line lu bricator is not
used, disconnect the air hose and pour about 3 cc of oil into
the air inlet of the tool.
Before storing the tool or if the tool is to be idle for a period
exceeding twenty-four hours, pour about 3 cc of oil into the
air inlet and operate the tool for 5 sec onds to coat the in ter-
nal parts with oil.

INSTALLATION

Air Supply and Connections
Always use clean, dry lubricated air. Dust, corrosive fumes
and/or excessive moisture can ruin the motor of an air tool.
An air line filter can greatly increase the life of an air tool.
The filter removes dust and moisture.
Make sure all hoses and fittings are the correct size and
are tightly secured. See diagram PP1 for a typ ical piping
arrangement.
The tool is shipped from the factory with 3/4" NPT male inlet
thread and quick release coupling.
Diagram PP1
PLACING TOOL IN SERVICE
Oil

OPERATION

Accessory Installation
:$51,1*
Always turn off the air supply and disconnect the air
supply hose before installing, re moving or ad justing
any accessory on this tool or before performing any
maintenance on this tool. Failure to do so could result
in injury.
For spring Type Retainer
1. Operate the Latch until it is approximately 90 de grees
to the body of the tool and clicks into po sition.
2. Insert the accessory into the tool until the collar of the
accessory is past the Latch.
3. Operate the Latch until it is parallel to the tool and it
clicks into position.
15 – 20 kg (30 – 40 lbs) is the recommended amount of down-
force to apply to the tool when working.
The amount of downforce is correct when the tool hits rhyth-
mically, is comfortable to hold and works efficiently.
127,&(
Do not repair the tool at the work site. Always take
the tool to a repair shop. Never drag the tool on the
ground. The air port and other openings will become clogged
with dirt and debris.
&$87,21
Compressed air is dangerous. When blowing the line clear
of dirt, wear eye protection and keep the air line directed
toward a safe, clear area.
Always blow out the air line before using to clear the line
of dirt.
&$87,21
Do not operate the tool unless the chisel is against
the work since this will cause premature wear of
parts and reduce the vibration isolation properties
of the tool.
*%
17

Werbung

loading

Diese Anleitung auch für:

Ir17js