SKETCH OF AN INSTALLATION

PLACING THE TOILET

The toilet has a Build-in module that must be built into the wall. You can also create a box around the
Build-in module. Clearance between Build-in module and rear wall is recommended, approx. 5mm.
Please note that recommended panel thickness is 8mm, and a thicker panel will reduce the space for
insulation around the exhaust hose. Sufficient insulation space must be maintained, in order to main-
tain the insulation properties.
If the floor is molded in a hard plastic material, preventing you from placing the toilet where you would
prefer it, the material may need to be removed, and a new floor installed, unless it is possible to modify
parts of the floor. You should consider that the ash container insert regularly must be emptied. This will
require at least 40 cm space in front of the toilet. There must be at least 5 cm clearance on each side of
the toilet, but keep user comfort in mind and provide extra room if possible.
The toilet has four fixing points to the floor. Remove ash container for access. If the bathroom has floor
heating, take precautions when fixing the toilet to the floor.

EXHAUST AIR

Exhaust hose with insulation is fed from roof feed-though flange to the toilet and secured at each end
with a powerful hose clamp that is included in the installation kit. Avoid horizontal stretches (max.
60cm) and turns as far as possible as this creates counter pressure and will cause increased stress on
the toilet over time and the possibility of overheating. Bends should be as gentle as possible. Under
no circumstances should negatively fall or sharp 90° bends occur as this will cause overheating of the
product. The insulation must not be squeezed as this affects the insulating and special care must be
taken for proper sealing in both ends. Exhaust hose should be mounted to toilet and feed-through
flange with exhaust paste to avoid leakage.
On top of the roof feed-through flange, a chimney cap is mounted, this is included in the toilet box.
If there are larger objects within one meter of chimney cap, or if there is snow on the roof that can
prevent air flow, an extension must be mounted between the flange and the chimney cap.
The roof feed-through flange must be placed in a flat area of the roof, to ensure proper sealing. Find a
suitable place where the flange makes good contact with the roof and make a hole in the roof with an
83mm hole saw. Take precautions when making the hole through the roof, to avoid electric cables.
Be sure to use enough sealant between the flange and roof to ensure no water ingress. Roof feed-
through is in material quality EN 1.4016. Take necessary precautions to avoid galvanic corrosions.
Fasten roof feed-through flange with appropriate stainless steel screws.
4

INLET AIR

An inlet air hose is included in the installation box. Use a
Chimney cap
83-mm hole saw for implementation in flooring. An op-
tional floor nozzle is available for double floors. Consider
Roof feed-through
air supply into double floor compartment for sufficient
air flow.
If the wheel arch or other obstructions prevent the hose
Insulation
from going directly down, it can be bypassed, but make
sure the hose is routed with gentle bends and as short a
Exhaust hose
stretch as possible, maximum hose length 1.2 m. Finish

Inspection hatch

with floor nozzle under floor exterior. The hose may be
insulated, if desired.
Build-in Module
An air grate can be used in both floor and wall, but make sure you have a minimum 50cm² light open-
ing and that you protect against water intrusion. Please note that floor intake is preferred instead of
wall intake. If the toilet in large parts of the year is used in cool climates that experience extreme cold
for extended periods, condensation may form on the outside of the toilet. It may be advantageous to
Inlet air hose
preheat the air in. This can be done using a radiator connected to the heating system that preheats the air.
Inlet air flange

GAS INSTALLATION

The gas is supplied through an 8mm pipe directly to the toilet with an angled compression fitting on
top of the build-in module. No adjustment of fitting is allowed. The toilet is designed to run on LPG. If
you know that you frequent areas with low quality LPG, a filter should be considered. A separate gas
shut-off valve is required when connecting to an existing gas supply line.
This will aid trouble shooting and allow operation of other appliances in case of dismounting the toilet.
The connector is a brass compression coupling which takes ø8 pipe. Be sure to clamp the pipe close to
the fitting to avoid stress fatigue in the pipe.
INSPECTION HATCH
There must be access to the top of the Build-in module
for easy access to connections. This allows for annual
inspection and leak testing of the gas connection.

CONTROL PANEL

Locate the desired placement of the control panel.
Create an opening for the signal cable and route the
cable out here. The signal cable is a flat cable with ap-
prox. 20mm width.
Connect the signal cable together with the control cable
and fasten the control panel. The signal cable can be
connected in two ways, but only one way is correct.
If you get a red light, and not a green, reconnect signal
cable the opposite way. The signal cable is approx.
150cm long.

CONNECTING AND TEST OF TOILET

Testing procedure after installation and before adding panels and closing hatches
• Open main gas supply valve from gas container
• Check for gas leakages on supply line
• Turn om main switch located inside toilet
• Open and close toilet lid
• Start incineration on control panel
• Wait 2-3 minutes for continuous incineration
• Stop incineration by pressing incineration button until a long beep is heard (approx. 9 sec)
• Close main gas supply valve from gas container
If you do not have the control panel in place yet, you can still test the toilet by connecting the control
panel to the signal cable.