Positioning the upper cover
4
Positioning the upper cover
4.
Position the top thermal insulation disc [8], [9].
5.
Position the top cover (cap) [10].
5
Attaching plug-on collars
6.
Rotate the collars with a slight pressure in the clockwise direction on the pipe connection [11], [12].
ATTENTION - Damage to the thermal insulation due to incorrect fitting of the plug-on collars. Push the collars gently onto the pipe
connections.
Installation of the thermal insulation is completed.
4 — English
Heat insulation PVC + fleece — 08. 2017