Herunterladen Diese Seite drucken

Seagate BARRACUDA 2LP Installationsanleitung Seite 18

Werbung

16
Barracuda 2LP Installation Guide, Rev. E
DC power requirements
5
Voltage regulation
Maximum operating current
Maximum starting current
3, 6
Peak DC
3
Peak AC
Delayed motor start (max)
Peak operating current
1, 10
Typ DC
1
Max DC
Max (peak)
Track following (DC)
1
at OD
1
at ID
Read track
1, 14
OD DC
AC
Seeking
1, 13
Typical DC
1
Maximum DC
Maximum (peak) AC
Single-ended
Differential
+ + + + + 5V
+ + + + + 12V
+ + + + + 5V
11
± ± ± ± ± 5%
± ± ± ± ± 5%
± ± ± ± ± 5%
2
Amps
1
0.93
0.6
1.17
0.93
1.35
1.00
1.93
1,4
0.88
0.12
0.92
0.91
0.57
1.13
0.93
0.60
1.17
1.00
1.56
1.95
0.91
0.5
0.99
0.88
0.51
0.96
0.96
0.53
1.35
1.03
0.73
1.95
0.89
0.78
0.99
0.92
0.82
1.10
0.95
1.60
1.67
+ + + + + 12V
11
± ± ± ± ± 5%
2
0.6
1.35
1.93
0.12
0.57
0.60
1.56
0.50
0.51
0.53
0.73
0.78
0.82
1.60

Werbung

loading