Herunterladen Inhalt Inhalt Diese Seite drucken

Replacement Of Malfunctioning Drive And Data Rebuild Instructions; System Temperature Overheat And Fan Failure Management; Visual Status Indicator Definitions - Stardom SR4-WBS3 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für SR4-WBS3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9

6. Replacement of Malfunctioning Drive and Data Rebuild Instructions

When a front hard drive indicator has lit up red and the audio alarm sounds, this could mean the indicated
hard drive may be malfunctioning. If this occurs, you may press the mute button at the rear of the system
to shut off the audio alarm and power off the system immediately if in the allowed operational state, and
then re-power on the system to double check and see if in fact the indicated hard drive has
malfunctioned. If the problem persists, please turn off the system and follow the directions below :
Step 1 Remove the drive tray containing the malfunctioned hard drive and disassemble the hard drive
from drive tray.
Step 2 Mount the new hard drive onto the tray and insert it back to the empty drive position of the SR4,
then push the latch into place making sure it is secured and locked.
Step 3 In RAID 5 mode, when you turn the system on, the hard drive status indicator of the replacement
drive will interchangeably blink red and purple to inform that the data is being rebuilt to the
replacement drive. During data rebuild, you may operate the SR4-WBS3 as normal. When the
indicator stops, the data rebuild process has been completed.

7. System Temperature Overheat and Fan Failure Management

If the alarm indicator has lit up red and the audio alarm sounds, this could mean that either a system fan
has stopped operating entirely or the system temperature has exceeded over the default temperature of
60°C. When this occurs, you may press the mute button at the rear of the system to shut off the audio
alarm and power off the system immediately if in the allowed operational state to let the system cool.
Check and see if the overall operation environment is well ventilated and make sure there are no
blockages to the enclosed fan and then re-power on the system to continue use. If the problem persists,
please turn off the system and contact your supplier or the STARDOM tech support for further assistance.

8. Visual Status Indicator Definitions

States
States
Power LED
Power on
Blue
No disk
Blue
Disk Fail
Blue
RAID Fail
Blue
Disk Idle
Blue
Format
Blue
Access
Blue
Fan Fail
Blue
Over Temp
Blue
Rebuilding
Blue
Front LED
Front LED
Front LED
Alarm LED
------
------
------
------
------
------
------
Red
Red
Source: Blue flash
------
Target: Blue and Purple light on alternatively
SOHORAID SR4 User Manual
HDD LED
Blue flash -> Blue
------
Red
Red
Blue
Blue flash
Blue flash
Blue
Blue
7
buzzer
buzzer
1 long when
booting finished
------
------
4 short
------
------
------
4 short
4 short
------

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis