Herunterladen Inhalt Inhalt Diese Seite drucken

Inhaltsverzeichnis; Package Contents And Product Views - Stardom SR4-WBS3 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für SR4-WBS3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 9
Introduction
Thank you for purchasing STARDOM products. This manual will introduce the SOHORAID SR4 Series.
Before using your SOHORAID SR4, please read this manual thoroughly. Although all information
contained in this user manual has been carefully verified before publishing, however, the actual product
specification will be based on the time of delivery from STARDOM. Any updates to the product
specifications or relevant information may be found on www.stardom.com.tw. Products are subject to
change without prior notifications.
If you have any questions regarding the products of STARDOM, or you would like to know the latest
product information, user manual update, or firmware update, please contact your local supplier or visit
www.stardom.com.tw for further information.
Copyright © RAIDON TECHNOLOGY, INC. All rights reserved.
Table of Contents
2. Environmental Requirements
1.

Package Contents and Product Views

Open the package and you should find the following:
Please make sure that the contents listed above are not damaged or missing. If you should find damages
or missing contents, please contact your supplier immediately.
SR4-WBS3x1 ( with removable drive tray enclosed x 4 )
Firewire 800 (1394b) Cable x1
e-SATA Cable x1
USB 3.0 Cable x1
AC Power Cable x1
Accessories Kit
SR4-WBS3
User Manual
3
SOHORAID SR4 User Manual

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis