Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Layout; Preparatory Steps; Installation - KEY STAR 500 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 26
8
5
1
6
The new series of actuadors STAR, has been devised to serve gates up to 600 Kg with leaf up to 5 meters
wide.
Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
Open the packaging and check that the gear motor has not been damaged during transport
Install the ledges for the opening and closing
ges for the opening and closing

INSTALLATION LAYOUT

4
5

PREPARATORY STEPS

INSTALLATION

12
1
actuator
2
Blinker
3
Aerial
4
Key or digital selector
5
Photocells
6
Column
7
Warning board
8
Control unit
7
5
5
6
1
3
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis