SEVERAL SETS WORKING TOGETHER – SETUP NOTES
Even if the transmitters and receiver have 16 channels, you cannot use 16 wireless systems together: de-
pending on the situation you will be able to use maximum 3 or 4 sets together.
While setting up more than one system, you should choose different channels for each set. It's important that
you never choose consecutive channels. Instead try to divide the channels evenly over the 16 possibilities:
ex. for 3 sets  set1: ch1 * set2: ch7 * set3: ch 15
 First setup one system and leave it switched on. (see above for more information)
 Setup the second system and check if it interferes with the first one (unwanted buzz noises etc.). In case of
interferences, select another channel for your 2
the set switched on.
rd
 For the 3
set, just repeat what you did for set2 until all 3 sets can work together.
Some notes: keep the transmitters at least
CHARGING BATTERIES INSIDE THE TRANSMITTER
 Put 2pc AA rechargeable Ni-MH batteries in the transmitter
and close the compartment.
 Connect the supplied charger cable between the receiver
charger output (11) and the charger input on the transmitter.
 Switch the receiver on: the transmitter is automatically
switched off while the "low level LED" starts flashing. It takes
about 10hours to fully charge the batteries.
IMPORTANT NOTE:
NEVER insert dry batteries (like alkaline type) while using
the charger function. Explosion of the batteries is possi-
ble!

TROUBLESHOOTING

Problem
Solution
No sound
 Check the power supply of the microphone and receiver.
 Check that the transmitter and receiver are tuned to the same channel (frequency).
 Check if the hi-fi appliance or audio mixer is switched on and the receiver output is
connected to audio desired input. Mixer: is the gain open?
 Check if the transmitter is too far away from the receiver or SQUELCH control is set
too high.
 Check if the receiver is located near a large metal object or if there are large obstruc-
tions (ex. large metal object or thick wall) between transmitter and receiver.
Sound interference  Check the antenna location.
 When using 2 or more microphone sets simultaneously, make sure that the selected
channels don't interfere: select another channel pair on one of the sets.
 Check whether the interference comes from other wireless microphones, TV, radio,
PC, etc.
Distortion
 Check if the receiver volume level is set too high or too low.
 Check if the mic/line switch and gain volume on the belt pack are correct.
 Check if the interference comes from other wireless microphones, TV, radio, PC, etc.
CLEANING THE APPLIANCE:
Clean by wiping with a polished cloth slightly dipped with water. Avoid getting water inside the unit. Do not
use volatile liquids such as benzene or thinner which will damage the unit.
JB SYSTEMS
®
OPERATION MANUAL
nd
set and try again until everything works well and leave
7/48
WMS-1 + WBS-2 Wireless system
ENGLISH

DECLARATION OF CONFORMITY

RECEIVER: R&TTE Declaration of Conformity
Brand :
JB Systems
Product Group :
Wireless Receiver
Model n° :
WR-1
Meets the essential requirements as described in the directives :
EN 300 422-2 : V1.1.1 (2000-08)
EN 301 489-01 V1.6.1 (2005-09)
EN 301 489-09 V1.3.1 (2002-08)
IEC 60065_2001 / EN 60065_2002
Full test reports and other relevant information remain at the disposal of the Control Agencies at our head office:
Beglec NV ~ 't Hofveld 2 ~ B1702 Groot-Bijgaarden ~ Belgium
Groot-Bijgaarden, July 25th 2009
For Beglec NV,
Luc De Bauw
Director
WIRELESS HAND MICRO : R&TTE Declaration of Conformity
Brand :
JB Systems
Product Group :
Wireless Transmitter
Model n° :
WMIC-1
Meets the essential requirements as described in the directives :
EN 300 422-2 : V1.2.2 (2008-03)
EN 301 489-1 V1.8.1 (2008-04)
EN 301 489-9 V1.4.1 (2007-11)
EN 60065_2002 + A1/2006
Full test reports and other relevant information remain at the disposal of the Control Agencies at our head office:
Beglec NV ~ 't Hofveld 2 ~ B1702 Groot-Bijgaarden ~ Belgium
Groot-Bijgaarden, July 25th 2009
For Beglec NV,
Luc De Bauw
Director
WIRELESS BELT PACK : R&TTE Declaration of Conformity
Brand :
JB Systems
Product Group :
Wireless Transmitter
Model n° :
WBP-2
Meets the essential requirements as described in the directives :
EN 300 422-2 : V1.1.1 (2000-08)
EN 301 489-01 V1.6.1 (2005-09)
EN 301 489-09 V1.3.1 (2002-08)
IEC 60065_2001 / EN 60065_2002
Full test reports and other relevant information remain at the disposal of the Control Agencies at our head office:
Beglec NV ~ 't Hofveld 2 ~ B1702 Groot-Bijgaarden ~ Belgium
Groot-Bijgaarden, July 25th 2009
For Beglec NV,
Luc De Bauw
Director
NOTE:
WMS-1 wireless set contains:
1pc WMIC-1 + 1pc WR-1
WBS-2 wireless set contains:
1pc WBP-2
+ 1pc WR-1
JB SYSTEMS
®
OPERATION MANUAL
8/48
WMS-1 + WBS-2 Wireless system