Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Service Inspection - OpeMed PR4950 Gebrauchsanweisung

Washbasin
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33

Maintenance

Expected service life of the wash basin lifter is 10 years, provided that
maintenance is carried out as described below:
en
3
14
It is recommended on a weekly basis to
run the motors on the product to their
maximum positions by raising the product
to its full height, and then lowering it to its
lowest position, so that the internal parts
are lubricated .
It is recommended that service inspection
is done once a year .

Service inspection

Take the wash basin to its highest position .
1
Remove the lower front cover
need any tools, as the cover has a click lock .
Check all electrical connections for the
control box
Lubricate the inner square tubes
WD-40 or equivalent . You have to reach up
under the upper front cover to reach the
tubes .
3
Reconnect mains .
Lower the wash basin to its lowest position,
2
and then run it to the top position again to
distribute the lubricant .
Reattach the lower front cover .
Disconnect mains before
removing the covers.
Labelident GmbH Art.-No.: W08-05
.
2
. You do not
1
with
3

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis