Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Commissioning And Operation - Klarstein Florenz Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
EN
16

INSTALLATION

Note: Before using the coffee grinder for the first time, thoroughly clean the lid, the
hopper, the motor housing, the container lid, and the container (refer to the "Care
and maintenance" section). Then thoroughly dry them. Remove any foreign objects or
debris from the container and hopper before each use.
1. Securely attach the hopper and lid onto the motor housing.
2. Pour the coffee beans into the hopper.
Note: The hopper has a capacity of 250 g. Do not fill the coffee grinder beyond the
brim of the hopper.
3. Securely attach the container and container lid into the motor housing.
Note: The container has a capacity of 95 g. Do not fill the ground coffee beyond the
max line of the container.

COMMISSIONING AND OPERATION

1. Assemble the parts together. Make sure the hopper is empty and clean.
2. Fill the hopper with whole coffee beans.
3. Plug the product into a standard 220-240V AC electrical outlet.
4. Set the variable grind selector as shown in figure B.
5. Turn the doser/time switch to the number of cups you wish to grind.
6. Press the on/off button.
7.
Start the grinding by pressing down the top lid and keep it pressed down during its
working.
8. Unplug the product from the electrical outlet when it is not in use or left unattended.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis