Herunterladen Inhalt Inhalt Diese Seite drucken

Lighting Technologies Leader LED 100 A30 5000K/E/ Montageanleitung Seite 8

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.1.2. Remove bushings from both sides of cable connector. Place them on mains cable and
luminaire cable.
4.1.3. Connect wires according to cable connector's electrical scheme. Maximal tightening torque
- 0.5 Nm. Assemble cable connector in reverse order. Bushings tightening torque - 2.5 Nm.
4.2. Connections inside luminaire:
4.2.1. Remove luminare's cover by releasing screws.
4.2.2. Strip mains cable (max 2.5 mm2). Put the cable through cable gland and lock it. The cable
gland allows round cable with external diameter 6-10 mm. Connect power wires to terminals
block according to polarity shown.
When using DALI control(HFD luminaire family), control wires are connected to terminals block
(DA terminals) regardless of polarity.
When using 1-10V control(HFR luminaire family), control wires are connected to terminals block
(DA+ and DA- terminals) exactly according to polarity shown.
4.2.3. Replace luminaire's cover back and tighten the screws. Maximal tightening torque - 6 Nm.
8

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Leader led 100 d75 5000k /e/Leader led 140 a30 4000k /e/Leader led 140 a30 5000k/e/Leader led 140 d75 5000k /e/Leader led 200 a30 4000k /e/Leader led 100 d75 hfr 5000k /e/ ... Alle anzeigen

Inhaltsverzeichnis