Herunterladen Inhalt Inhalt Diese Seite drucken

COMEM R.I.S. Einbauanweisungen Seite 13

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

INSTRUCTIONS FOR TOPPING UP THE LEVEL ON THE R.I.S. DEVICE
INSTRUCTIONS
The operations are performed as follows:
A) Remove the cap "2", screw the valve "3" and its nipple onto the tap "1".
B) Remove the cap "4", fit the pump "5" by means of the threaded coupling provided and turn the lever to OFF position.
C) The pump is already set to create a vacuum.
D) To restore the oil level inside the R.I.S. device, open the lever of the tap "1" and suck with the pump "5". After this
operation, close the lever of the tap "1".
E) Release air from the pump, turning the lever to ON position.
If the oil level reached is not sufficient, repeat operations "D" and "E".
Once the operations are complete, remove the components "5" and "3" and close the device with the cap "2".
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für COMEM R.I.S.

Inhaltsverzeichnis