Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Installation steps

Step 1
- The tub (not included) is to be aligned with vertical walls in a 90 degree angle by means of a spirit
level.
- The joints are to be filled with silicone. The silicone is to be chosen respectively to the construction
materials used - please respect cure times.
Step 2
Put the side components and the upper and lower bend together with all components described as an
assembly support. Put the assembled frame body onto the shower. Align the frame body with a spirit
level. Draw the mounting holes. Mount the frame body to the wall as shown in pictograms.
3
2
3
1
2
1
1
3
2
1
3
2
3
Glass clamp
3
4
2
3
4
2
1
1
4
4
1
4
3
2
1
4
3
2
- 16 -
1
Glass clamp
3
4
5
1
Screw M4x25

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für Hagebau Summer

Inhaltsverzeichnis