Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Before The Installation; Built-In Hobs; Connection Cable - AEG HK854206XB Benutzerinformation

Vorschau ausblenden Andere Handbücher für HK854206XB:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

16
www.aeg.com
period. The instructions about the
Service Centre and conditions of
guarantee are in the guarantee booklet.

8. INSTALLATION

WARNING!
Refer to Safety chapters.

8.1 Before the installation

Before you install the hob, write down
the information bellow from the rating
plate. The rating plate is on the bottom
of the hob.
Serial number ...........................

8.2 Built-in hobs

Only use the built-in hobs after you
assemble the hob into correct built-in
units and work surfaces that align to the
standards.

8.3 Connection cable

• The hob is supplied with the
connection cable.
• Replace the damaged mains cable
only with the spare parts cable. Speak
to your local Authorised Service
Center.
One-phase connection - 230 V~
N
L
230V~
N
L
Green - yellow
Blue and grey
Black and brown
WARNING!
All electrical connections
must be made by a qualified
electrician.
CAUTION!
Do not drill or solder the
wire ends. This is strictly
forbidden!
CAUTION!
Do not connect the cable
without cable end sleeve.
Two-phase connection
1. Remove the cable end sleeve from
black and brown wires.
2. Remove an insulation of the brown
and black cable ends.
3. Apply a new wire end sleeve of 1.5
mm² on each cable end. (special tool
required).
Cable cross section
400V 2~N
Two-phase connection - 400 V 2 ~ N
Green - yellow
Blue and grey
Black
Brown
N
L1
L2
N
L1
L2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis