Herunterladen Inhalt Inhalt Diese Seite drucken

Vii.testing - Rapid RM04N Installations- Und Anwenderhandbuch

Vorschau ausblenden Andere Handbücher für RM04N:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

VII. Testing
1.Inspection before use
A . Check installation of the whole machine and the pipe connections
according to the pipe connecting drawing;
B.Check the electric wiring according to the electric wiring diagram; and
earthing connection;
C.Make sure that the main machine power switch is off;
D.Check the temperature setting;
E.Check the air inlet and outlet.
2.Trial
A.The user must "Start the Pump before the Machine, And Turn off the
Machine before the Pump", or the machine will be damaged;
B.The user should start the pump, check for any leakage of water; and then
set suitable temperature in the thermostat, and then switch on power
supply;
C.In order to protect the swimming pool heater, the machine is equipped with
a time lag starting function, when starting the machine; the blower will
run 1 minute earlier than the compressor;
D.After the swimming pool heater starts up, check for any abnormal noise
from the machine.
9

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rm08nRm05n

Inhaltsverzeichnis