Herunterladen Diese Seite drucken

Überprüfen Ablassventil • Testing Discharge Valve; Ausbau Kartuscheneinsatz • Removal Of Valve Cartridge Insert - Honeywell BA 295 Einbauanleitung

Werbung

4.2 Überprüfen Ablassventil • Testing discharge valve
Connect a differential pressure kit
Open ball valves 1 and 2
Close shutoff valves
Open shutoff valves
2
1
Slowly open the vent valve in zone 1 (inlet
pressure zone) on the differential pressure
measuring equipment until the differential
pressure starts to fall. Adjust the vent
discharge until the water is emitted at a
flow rate of one drip per second and note
the corresponding differential pressure as
the opening point of the discharge valve.
The opening pressure must be above
0.14 bar, otherwise a malfunction of the
discharge valve is present. Possible
causes for this are dirt or a mechanical
defect.
Close ball valves 1 and 2

4.3 Ausbau Kartuscheneinsatz • Removal of valve cartridge insert

Close shutoff valves
Briefly vent the appliance
through the ball valves
Unscrew the valve cap
from the housing
2
1
2
1
3

Werbung

loading