Herunterladen Inhalt Inhalt Diese Seite drucken

NetPeppers OPM 100 Kurzanleitung Seite 12

Ols 150 series
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EXAMPLE
Reference and test setup in order to the 2 Jumper Method
Test Setup
Reference Setup
REFERENCE SETUP
Connect light source (OLS) with OPM by two reference cables and connector according
to your test conditions and proceed reference setup by pressing the button [Ref]. Ensure
that OPM and light source (OLS) are set to the same wavelength.
TEST SETUP
After proceeding reference setup, connect light source (OLS) and OPM to both ends of the
transmission link and start testing. Note down the result.
Repeat the same procedure with all fibers of your fiber optic cable.
For further information of different testing methods (1 Jumper or 3 Jumper), and
interpretation of test results please refer to the relevant technical literature.
12

Werbung

Inhaltsverzeichnis
loading

Verwandte Produkte für NetPeppers OPM 100

Diese Anleitung auch für:

Ols 150mmOls 150sm

Inhaltsverzeichnis