Herunterladen Inhalt Inhalt Diese Seite drucken

Hints; Cleaning And Maintenance - Smartworks PK 1100 Bedienungsanleitung

Kompressor “air box” 1100 watt
Inhaltsverzeichnis

Werbung

 You do not need an adaptor to inflate a motor vehicle tyre or a
bicycle tyre with a Schrader valve. Attach the air pressure hose with
the quick coupler to the valve (press lever, insert quick coupler to the
tyre valve, release lever). Make sure the coupler is turned as far as
possible onto the valve to be closed air-tight.
 The tyre filling adaptor can be converted to an air blowout pistol.
Unscrew the connection of the air filling hose on the tyre filler adap-
tor and replace the hose with the nozzle of the air blowout pistol (6).
 Set the switch to the position „ON", in order to switch on the
compressor.
 Connect the tyre filling adaptor to the object to be filled. Press the
trigger of the tyre filling adaptor. See the air pressure on the pres-
sure manometer on the tyre filling adaptor (5). Hint: This gauge is
not calibrated and we recommend before driving, check the air
pressure with a calibrated air pressure manometer.
 The quick coupler on the air hose of the compressor can be used to
connect other devices which are suitable to be operated by the
airflow and pressure the compressor can provide.

Hints

 Do not inflate objects to a pressure for which they are not intended.
Do not pump up larger objects such as lorry tyres, tractor tyres or
inflatable boats. These exceed the permissible operating range of
the compressor account of the long pumping time. In such a case
use an inflator to complete the desired air.
 Please keep in mind that smaller items such as volley- or footballs
are filled very quickly. Always check the pressure and read the
operating notes by the manufacturer for these objects.
 Do not leave the compressor unattended while it is in operation.
 Do not use the compressor for more than 10 minutes continu-
ously and allow it to cool down for at least 50 minutes.

Cleaning and Maintenance

 Before undertaking any cleaning or maintenance, please pull the
power plug and allow the unit to fully cool down.
Start-Up and Operation
14

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis