Herunterladen Diese Seite drucken

Assembly Tools - TEIKO SKPÚ 4/90 Montage-, Bedienungs Und Pflegeanleitung

Fünfedusche mit beweglichen teilen

Werbung

1.
Description of the enclosure assembly works. Before
you begin to assemble the enclosure please check up
whether the bath is firmly fixed and leveled. The shower
-tray does not have to be provided with masking
РУС
(protective foil). Prior to assembly works we recom-
mend you to put cardboard as a protective pad inside
the shower-tray (cardboard).
2.
Set up the shower enclosure with already inserted "C"
wall profiles onto the shower-tray. Align position of the
wall profiles vertically about 5 mm from the rim of the
shower-tray. With a pencil mark position of the "C" wall
profiles. Take the wall profiles away from the shower
enclosure, by the mark hold it on the wall and mark
the holes for dowels. Drill 6 mm in diameter holes in
the wall and insert "a" dowels into them. Apply a thin
layer of silicon on "C" profile and fix it firmly to the wall
with "b" screws.
3.
Slide the shower enclosure into the wall profiles. Set
up the shower enclosure so it lays tight on the shower
-tray and be sure the vertical profiles of the fixed screen
to be inserted uniformly into the wall profiles. Drill the
INSTRuCTION HOW TO uSE THE PROduCT
• We recommend you to clean it and keep it well so that the product could give you as best as possible service.
• Enclosures are treated with current cleaning agents for domestic use which do not contain solid particles.
• It is important to remove the grease out of guiding profiles and pulleys and clean them with a current detergent.
• Furthermore we recommend you to apply both mineral-jelly or protective glycerin gel on rails and guiding profiles.

ASSEMBlY TOOlS

1) Pencil
2) Water level
3) Angle bar
4) drill Ø 3 mm
5) drill Ø 6 mm
6) drilling machine with hammer
7) drilling machine
8) Cross-head screwdriver
9) Tape measure
4
shower enclosure and profiles from the inside in three
spots with a Ć 3 mm drill in a distance about 8 cm
from the top and lowest rim of the enclosure as well as
in the middle. Drive in the 3,5 x 9,5 mm screws. Provide
the screws with the "d" caps.
4.
Set up correct position of the door parts (if necessary).
Close the enclosure door and slightly loosen the bolts
of the pulleys joints. By height adjust position of the door
by moving joints upwards or downwards. Screw up the
bolts; check up movement of the door as well as both
magnetic profiles whether they fit at the door closed
position. Provide screws of the joints with the "e" caps.
5.
Remove the masking (protective foil) from the inside
of screens (just in case when a PEARL-type screen is
used). Screen wall profiles connection to the shower
-tray and walls has to be sealed from the outside of the
shower enclosure with silicon. The sealed surfaces
have to be dry and clean, deprived of dust. Silicon is to be
applied with a splayed tip of the gun into the corner
of the joint and has to be slicked down with spatula or
by finger moistened in a liquid soap.
keep the silicon curing for 4 hours!!!
>