Herunterladen Diese Seite drucken

Heidolph RZR 2020 Betriebsanleitung Seite 17

Vorschau ausblenden Andere Handbücher für RZR 2020:
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1. Install stand
make sure the indent (A) of the rod is in line with threaded pin (B).
Install stand in hole (C) in the rear of the item. Secure (pull tight)
threaded pin (B) using Allen key (D).
H
E
F
3. Install stirrer on stand
Install clamp (I) on stand (J).
Now introduce stirrer attaching rod (K) into clamp (I).
Adjust position and secure (pull tight) with two clamp screws (L).
5. Install flexible coupling shaft (P/N 509-03000-00)
Hold the flexible coupling shaft (O) in the chuck (G) by its metallic stud
(P) and secure with T-handle. At this point introduce stirring tool's (N)
shaft end in collet (Q) and pull tight (CW turn).
When using the flexible coupling shaft make
sure to install an adequate run-out protection,
e.g. our enclosure (P/N 509-09000-00)
SET-UP
G
2. Install chuck
make sure the indent (E) in the drive shaft is in line with threaded
pin (F) in the chuck. Secure threaded pin (F) with allen key (H) in
your hardware bag.
M
G
N
4. Install stirring tool
Introduce stirring tool (N) in chuck (G), put in place and secure
with T-handle (M). Immersion depth of your stirring tool (N) is ad-
justed by displacing the tool in or out of the open (G) chuck (refer
to arrow mark).
17
B
L
K
J
E
D
C
A
I
L
G
P
O
Q
N
loading

Diese Anleitung auch für:

Rzr 2021Rzr 2041