Herunterladen Diese Seite drucken

DEFA homeCLU Installationsanleitung Seite 30

Verfügbare Sprachen

Verfügbare Sprachen

Phase rotation, single phase charging,
TN network:
Addr.
Addr.
Addr.
1
2
3
L1 N
L2 N
L3 N
L1 N
L2 N
L3 N
Phase rotation, three phase charging, TN network:
1.
All charge points to be connected the same way:
• Brown = L1
• Black = L2
2.
Create a fixed phase rotation at the output of the fuses, or terminal blocks, one rotation-
step per connected charge point.
3.
All phases may be distributed with a regular "L1-L2-L3-N" bus bar suitable for 4-pole DIN
block devices.
30
English
Addr.
Addr.
Addr.
4
5
6
L1 N
L2 N
L3 N
L1 N
L2 N
L3 N
• Grey = L3
Phase rotation, three phase charging,
TN network:
Addr.
Addr.
1
2
1
L1-L2-L3-N
L2-L3-L1-N
L3-L1-L2-N
2
3
L1 L2 L3 N
L1 L2 L3 N
• Blue = N
Addr.
Addr.
Addr.
Addr.
3
4
5
6
L3-L1-L2-N
L1-L2-L3-N
L2-L3-L1-N
L1 L2 L3 N
www.defa.com
loading

Verwandte Produkte für DEFA homeCLU