Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Safety Regulations; Inspecting And Unpacking - Legrand Keor Compact Installationsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 69

3. Installation

DANGER
All EBC installation operations must be carried out exclusively by a SKILLED TECHNICIAN (paragraph 2.2.1).
3.1

Safety regulations

CAUTION
Before carrying out any installation operation you must read and apply the following:
1. Consult chapter 2 of the manual containing mandatory safety regulations and wear the Personal Protective Equipment
mentioned in paragraph 2.3.
2. Turn off the UPS and disconnect it from the power supply before the EBC installation.
3. The connection to the earth ground is essential for safety and proper installation and operation. Before carrying out
any other installation operation, connect the earthing wiring.
4. Do not carry out the installation if there is water or humidity around.
3.2

Inspecting and unpacking

Carefully inspect the outer packaging for evidence of damage during transit.
If there is possible or ascertained damage, immediately inform:
- the transporter;
- the LEGRAND Technical Support Service.
Check that the equipment corresponds with the items indicated in the delivery documentation.
Battery Fixed Suppor:
10pcs
Nylon Rivet: 60pcs
Cable#6398: 3pcs
Cable#5075: 3pcs
External Battery Cabinet
Screw (M3 x 6mm):
10pcs
Fuse: 3pcs
Keor Compact
Mylar Film:
30pcs
Cable#0544: 78pcs
Cable#0189: 8pcs
Cable#5038: 3pcs
Cable#5040: 3pcs
33
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

3 110 943 110 953 110 963 110 97

Inhaltsverzeichnis