Herunterladen Inhalt Inhalt Diese Seite drucken

Connection Diagram - Honeywell 012168 Montageanleitung

Netz-/ladeteil 12 v dc / 80 ah
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting and Connection Instructions Mains/charger unit 12 V DC / 80 Ah
7.

Connection diagram

*
SE
Fault
Fault
+12V DC
Output
0V
Mains
Fault U_ext.
!U_bat<
Test
U_bat < 10.5V
0V
Accum. 1
S100
Si102
Si103
+24V DC
ST103
0V
Accum. 2
Bore holes for
soldering the
connection cable of
*
the external NTC
0V
internal test voltage
+12V DC
0V
internal test voltage
+12V DC
Ext. user 1
Ext. user 2
0V
0V
Important note
- If several power supplys are used for increasing the emergency power capacity, the 0 V potentials of all power
supplys must be interconnected via KL103/KL104.
Accum. fault
U_bat
Charger controller defective
Mains missing
Fault U_ext.
SE
active
Reset key
Secondary voltage 24V
Secondary voltage 15V
When using an external NCT,
DB102 must be debridged
NTC100
Charge terminating voltage
*
These Potis (PO101, PO102)
may not be adjusted
Potentiometer
PO 100 charge terminating voltage
Fuses:
Si100
Si101 1.6 AT External user 2 +12 V DC
Si102 8 AT
Si103 1 AT
Si104 2 AT
Si105 1 AT
LED Indication:
LD1
LD2
LD3
LD4
LD5
LD6
LD7
LD8
DIP Switch S100
Fault messages can be switched through to
collective fault with S100.
The respective switch must be at the "ON"
position.
S100/1
S100/2
S100/3
S100/4
For VdS compliant applications, the following
settings apply:
S100/1 = ON
S100/2 = OFF
S100/3 = ON
S100/4 = ON
Wire Jumpers:
DB100:
DB101:
DB102:
Mains
230V AC
Ext. user
230V AC
1.6 AT External user 1 +12 V DC
Accumulator charging
Output 24 V DC
Primary fuse
External user 230 V AC
Accumulator fault
U_BAT <10.8 V switch-off warning
U_BAT <10.5 V switch-off of power
supply
U_BAT <9.45 V accumulator defective
Charger controller defective
Mains voltage missing
Fault external user
Fault input
SE
actuated
Fault - external user
Mains fault
Accumulator defective (<9.45 V)
Charger controller defective
Open, when the non-fused earth
conductor registers faults
Open during continuous operation
without accumulator
(not Vds-compliant)
Open, when external NCT is
connected
Before opening the housing, wait
until the electrolytic capacitors are
discharged (approx. 3 minutes).
Please observe Chapter 2 and 3
in these instructions!
7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis