Notice
Four screw holes on the furrow are used in this step. The four smaller screw holes
on the ribs are not used in this step.
Through the left two screw holes, [W2] is nailed to [SQ] and [WZ1][WZ2] which
are beneath [SQ].
Position [W2] so that the [L-channel] dangles outside the shed. This [L-channel]
servers as a support for the eaves.
After Step 3.3 is done, you should unfix the two [S3] you fixed in step 3.2.
3.4
Notice
Four screw holes on the furrow are used in this step. The four smaller screw holes
on the ribs are not used in this step.
Through the right two screw holes, [W1] is nailed to [BQ] and [WZ1][WZ2] which
are beneath [BQ]. Position [W1] so that the [L-channel] dangles outside the shed.
This [L-channel] servers as a support for the eaves. Stack [W2] and [W1] via their
[Uchannel], but do not use [S3] to fix them together yet.
If you have any further questions, please contact us:
contact@vendomnia.rs
[S3]+[S4] x 4
[W1]
[W2]
RIGHT
[W1]
[U-channel]
21
EN