• Method 2: Direct connection via a home circuit breaker (United Kingdom only)
• Professional Installation Required: This step must be carried out by a qualified electrician.
• Power Must Be Off: Before beginning installation, ensure the power is switched off at the installation site.
• The PE and N wires should be connected separately to the PE-bar and Neutral-bar, and the L wire should be
connected to the terminal on the breaker that leads to the load side.
A3
×1
• Method 3: Indirect connection via an EcoFlow STREAM Max
• In this setup, make sure all connected STREAM devices are bound to your EcoFlow account in the app after
completing the connection.
8 |
❶
❷
Click
❷
❶
Click
PH0
A3
❸
PH0
❹
2025-04-24