3.Installation procedures
1. Put "B" on top of "A" as shown
3. Place part "D" as shown
5. Hammer part "C" into the 4 holes of
Part "A" as shown in the picture
This product can be used in combination, two or more pieces connected
together; installation is as follows.
2. Place part "C" on top of part "B", as
shown in the picture
4. Place part "E" as shown, and install it
with a screwdriver
6. The installation is complete, as shown
in the figure.
- 4 -